ILV strengthens its energy infrastructure: an additional Tesla Gama 233 battery storage system in operation
ILV has expanded its energy infrastructure with an additional BESS Tesla Gama 233 battery storage system from TESLA ENERGY GROUP a. s. The system is connected and is currently running in a trial operation, during which its behaviour is being verified under real operating conditions.
In combination with ILV’s own photovoltaic system, the solution enables more efficient energy management in operation – from storing surplus energy to balancing consumption throughout the day. The goal is higher capacity and improved energy stability of the operation.





